This week has mostly been spent applying graphics, getting the boxes laquered, holes drilled out and most of the knobs and foot switches fitted. There are some LEDs still to go in and the circuit boards and other internal parts to be put in place and wired in. Then it's on to testing.

Foot switches and LEDs still to go in, plus internal build.

Two LEDs to go in, plus internal build.

LED going at the top. Looking good with white knobs.

Knobs and switches all done. Internal build can start.


Box painted lovely custard yellow, graphics ready to be applied.